CSpace
A two-stage UAV routing problem with time window considering rescheduling with random delivery reliability
Yan, Rui1; Tian, Haotong1; Gao, Kaiye2,3; Peng, Rui4; Bin Liu5
2022-06-14
发表期刊PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY
ISSN1748-006X
页码17
摘要Reliability is an important metric for unmanned aerial vehicles (UAVs) to perform important, complex, and dangerous tasks. In addition, reliability influences the operational cost in UAVs routing. In order to reduce the operational cost of UAVs tasks, a method of routing strategy optimization is proposed from a view of mission reliability in this paper to address the limitations in routing scheduling. Different from previous studies on the UAVs routing optimization problem, this paper proposes a method that can reduce the operational costs of UAVs tasks based on the mission reliability. This method includes two stages: the pre-optimization stage and the rescheduling stage. In the pre-optimization stage, an optimal UAVs route solution is obtained for all the targets, while in the rescheduling stage, new UAVs are dispatched to the unvisited targets in the pre-optimization stage based on the new optimal UAVs route.
关键词Unmanned aerial vehicle system reliability vehicle routing optimization rescheduling strategy variable neighborhood search
DOI10.1177/1748006X221105395
收录类别SCI
语种英语
资助项目National Natural Science Foundation of China[71802021] ; National Natural Science Foundation of China[71801013] ; National Natural Science Foundation of China[71803029] ; National Natural Science Foundation of China[72001027]
WOS研究方向Engineering ; Operations Research & Management Science
WOS类目Engineering, Multidisciplinary ; Engineering, Industrial ; Operations Research & Management Science
WOS记录号WOS:000813099600001
出版者SAGE PUBLICATIONS LTD
引用统计
文献类型期刊论文
条目标识符http://ir.amss.ac.cn/handle/2S8OKBNM/61258
专题中国科学院数学与系统科学研究院
通讯作者Gao, Kaiye
作者单位1.Univ Sci & Technol Beijing, Sch Econ & Management, Beijing, Peoples R China
2.Beijing Informat Sci & Technol Univ, Sch Econ & Management, 12 Xiaoyingdong Rd, Beijing 100192, Peoples R China
3.Chinese Acad Sci, Acad Math & Syst Sci, Beijing, Peoples R China
4.Beijing Univ Technol, Sch Econ & Management, Beijing, Peoples R China
5.Univ Strathclyde, Dept Management Sci, Glasgow, Lanark, Scotland
推荐引用方式
GB/T 7714
Yan, Rui,Tian, Haotong,Gao, Kaiye,et al. A two-stage UAV routing problem with time window considering rescheduling with random delivery reliability[J]. PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY,2022:17.
APA Yan, Rui,Tian, Haotong,Gao, Kaiye,Peng, Rui,&Bin Liu.(2022).A two-stage UAV routing problem with time window considering rescheduling with random delivery reliability.PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY,17.
MLA Yan, Rui,et al."A two-stage UAV routing problem with time window considering rescheduling with random delivery reliability".PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART O-JOURNAL OF RISK AND RELIABILITY (2022):17.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Yan, Rui]的文章
[Tian, Haotong]的文章
[Gao, Kaiye]的文章
百度学术
百度学术中相似的文章
[Yan, Rui]的文章
[Tian, Haotong]的文章
[Gao, Kaiye]的文章
必应学术
必应学术中相似的文章
[Yan, Rui]的文章
[Tian, Haotong]的文章
[Gao, Kaiye]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。