CSpace  > 应用数学研究所
Performance analysis on a complex remanufacturing system
Hou, YM; Zhang, HQ
2005-09-01
发表期刊ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH
ISSN0217-5959
卷号22期号:3页码:327-347
摘要This paper focuses on the performance analysis on a complex remanufacturing system that consists of a disassembling shop, a remanufacturing shop, an assembling shop, and a warehouse. The optimal remanufacturing policy is given. Furthermore, by the matrix-geometric method, the immediate demand fill rate is established.
关键词inventory level immediate demand fill rate matrix-geometric method semi-Markov process
语种英语
WOS研究方向Operations Research & Management Science
WOS类目Operations Research & Management Science
WOS记录号WOS:000232501000003
出版者WORLD SCIENTIFIC PUBL CO PTE LTD
引用统计
文献类型期刊论文
条目标识符http://ir.amss.ac.cn/handle/2S8OKBNM/2178
专题应用数学研究所
作者单位Chinese Acad Sci, Acad Math & Syst Sci, Beijing 100080, Peoples R China
推荐引用方式
GB/T 7714
Hou, YM,Zhang, HQ. Performance analysis on a complex remanufacturing system[J]. ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH,2005,22(3):327-347.
APA Hou, YM,&Zhang, HQ.(2005).Performance analysis on a complex remanufacturing system.ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH,22(3),327-347.
MLA Hou, YM,et al."Performance analysis on a complex remanufacturing system".ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH 22.3(2005):327-347.
条目包含的文件
条目无相关文件。
个性服务
推荐该条目
保存到收藏夹
查看访问统计
导出为Endnote文件
谷歌学术
谷歌学术中相似的文章
[Hou, YM]的文章
[Zhang, HQ]的文章
百度学术
百度学术中相似的文章
[Hou, YM]的文章
[Zhang, HQ]的文章
必应学术
必应学术中相似的文章
[Hou, YM]的文章
[Zhang, HQ]的文章
相关权益政策
暂无数据
收藏/分享
所有评论 (0)
暂无评论
 

除非特别说明,本系统中所有内容都受版权保护,并保留所有权利。